“School up!”: Symbol of hope

If I could write a wish list for Christmas now, it would say: “Please don’t forget the children of Thulosirubari!” For two years now, the German aid organization “Nepalhilfe Beilngries” has been building the new school for more than 500 children and young people in the small mountain village about 70 kilometers east of the Nepalese capital Kathmandu. This was made possible by your donations for “School up!”, the aid project that I launched together with the professional mountaineers Gerlinde Kaltenbrunner and Ralf Dujmovits after the devastating earthquake in Nepal in 2015. The money we collect ends up in Thulosirubari and is used exclusively for the new construction.

Date

19. December 2018 | 17:21

Share

Feedback

Comments deactivated

“School up!”: Second floor slab concreted

The day draws to an end

Even the darkness cannot prevent construction from continuing in Thulosirubari. For 18 hours, concrete is mixed in the small mountain village 70 kilometers east of the Nepalese capital Kathmandu, transported upwards and distributed, then finally the second floor slab is casted. “Only one machine for mixing concrete was used for the work, the rest was done by physical labor,” writes Shyam Pandit, liaison man of the German aid organisation Nepalhilfe Beilngries. “Special skilled laborers were brought from Kathmandu for the casting.” After the first two parts of the new school building have been used for teaching since last spring, the construction work for the third section is now on the home straight: If everything goes according to plan, the new building with eight more classrooms could be completed in spring 2019.

Date

8. November 2018 | 23:35

Share

Feedback

Comments deactivated

“School up!”: First floor slab is finished

Construction side in Thulosirubari (on the right the two already completed school buildings)

“The construction work is going smoothly,” writes Shyam Pandit, who coordinates the projects of the German aid organisation Nepalhilfe Beilngries in the Himalayan state. At the end of last week, Shyam once again visited the construction site of the new school in the mountain village of Thulosirubari, some 70 kilometers east of the capital Kathmandu. After teaching in the first two parts of the building started as well as using the corresponding toilet block, the third and last section of the building is being constructed right next door. Your donations made this possible for our aid project “School up!”, which I founded together with the two climbers Gerlinde Kaltenbrunner and Ralf Dujmovits after the devastating earthquake in 2015, in order to rebuild the destroyed school in Thulosirubari as quickly as possible.

Date

25. September 2018 | 7:12

Share

Feedback

Comments deactivated

“School up!”: Base plate is concreted

The bricks are already there

Your donations for our aid project “School up!” continue to work. The base plate for the third section of the new school in the small mountain village of Thulosirubari, 70 kilometers east of the Nepalese capital Kathmandu, has now been concreted. In the next step, the bricks for the walls of the first floor will be laid. Ralf Dujmovits – the so far only German climber to have climbed all 14 eight-thousanders – and I had laid the foundation stone for the third construction phase with another eight classrooms in mid-March. At that time, the first two buildings had been festively inaugurated.

Date

2. August 2018 | 10:49

Share

Feedback

Comments deactivated

“School up!” – Building No. 3 is growing

Shyam Pandit (l.) at the construction site at Thulosirubari

The construction work is going smoothly,” writes Shyam Pandit, liaison man of the German aid organisation Nepalhilfe Beilngries” in Nepal. In Thulosirubari, a small mountain village about 70 kilometers east of the capital Kathmandu, the third part of the new school with eight additional classrooms is being built. The foundations are laid, the base plate is soon to be concreted. If all goes well, this third building could be ready by 2019. The first two buildings with classrooms for twelve school classes were – as reported – ceremonially inaugurated in March. At that time Ralf Dujmovits, the only German climber so far who stood on all 14 eight-thousanders, and I laid the foundation stone for the next construction phase in Thulosirubari.

Date

29. June 2018 | 10:00

Share

Feedback

Comments deactivated

“School up!”: Back to work in Thulosirubari

The next construction phase begins

Three years ago, the earth shook in Nepal. Nearly 8,000 people were killed in the devastating earthquake on 25 April 2015 and the aftershocks in the following weeks. Even today, numerous traces of the earthquake can still be found in the capital Kathmandu, and the rural areas, which were particularly hard hit. But a lot has happened. For example in Thulosirubari. Thanks to your donations for our aid project “School up!”, last March – as reported – the first two buildings of the new school with a total of twelve classrooms could be inaugurated in the small mountain village, located about 70 kilometers east of the capital. On this occasion, German climber Ralf Dujmovits and I also laid the foundation for the next phase of construction. As you can see in the picture, sent to me by Dulal Tanka from Thulosirubari, the construction of the third building with eight more classrooms is now beginning.

Please continue to support us!

The toilet house

Also the toilet house behind the school is taking shape. You see, your money keeps working. However, we have not yet reached the finish line. Once again here is the bank account of “School up!”:

Recipient: Nepalhilfe Beilngries e.V.
Bank: Volksbank Bayern Mitte eG/Germany
IBAN: DE05 7216 0818 0004 6227 07
BIC/SWIFT-Code: GENODEF1INP
Intended purpose: Gerlinde and Ralf School

Thank you so much! You are great!

Date

28. April 2018 | 22:13

Share

Feedback

Comments deactivated

“School up!”: Thulosirubari celebrates new school

Musicians accompany us to the school

This roadblock is not an ordinary one. Five hundred meters in front of the school grounds in Thulosirubari, 70 kilometers east of the Nepalese capital Kathmandu, our journey in a jeep ends. Eight musicians stand in the middle of the dusty piste through the village. When Ralf Dujmovits – the first and so far only German mountaineer who scaled all 14 eight-thousanders – and I get out of the car, they begin to play for us on their traditional instruments. Behind the music playing village band  we ascend the last meters to the school.

Arrival

There a big event has been organized for us. Several hundred students, parents, teachers, local notables and other residents of Thulosirubari are awaiting us for the ceremonial inauguration and handing over of the first two parts of the building to the local school committee – made possible by your donations to our aid project “School up!”. The old school had been so badly damaged by the devastating earthquake in Nepal on 25 April 2015 that it had had to be demolished. At the end of June 2015, I had launched together with Ralf Dujmovits and the Austrian climber Gerlinde Kaltenbrunner “School up!” to rebuild the Thulosirubari school as soon as possible.

Date

17. March 2018 | 9:30

Share

Feedback

Comments deactivated

“School up!”: Move to the new buildings

The first two buildings are finished

When I saw the pictures, I found myself almost in tears – for joy! The year 2018 could hardly begin any better. This week I received the news from Thulosirubari that the students have moved from provisional corrugated-iron classrooms, that had been built after the devastating earthquake in Nepal in April 2015, to the first two finished buildings of the new school. A big day for our aid project “School up!” which I had launched along with the climbers Gerlinde Kaltenbrunner and Ralf Dujmovits more than two and a half years ago!

Date

4. January 2018 | 20:41

Share

Feedback

Comments deactivated

“School up!”: First buildings almost completed

New school buildings in Thulosirubari (picture from today)

The finishing line of the first stage of our aid project “School up!” is in sight: The first two buildings of the new school in the Nepalese mountain village of Thulosirubari will most probably be ready for occupation before the beginning of winter. The doors are fitted these days,  Shyam Pandit, liaison man of the German aid organization “Nepalhilfe Beilngries” in the Himalayan state, writes to me. The windows are already installed. Subsequently, only the painting is missing. By the end of the month, says Shyam, the contractor wants to hand over the two first building units. Then the construction work will go on.

Date

2. December 2017 | 22:33

Share

Feedback

Comments deactivated

An inn for myself

Having arrived at the Oberalp Pass

“Gruezi” from the Oberalp Pass at an altitude of 2044 meters in Graubünden in Switzerland. After a ten-hour train journey, during which I had to change trains four times with about 40 kilograms of luggage (including my folding bike), I have reached the starting point of my donation bike tour “School up! River down!”. One of the Rhine sources is located about three kilometers from here. When I arrived up here late in the afternoon, I was surprised: early September and already winter conditions.

Date

10. September 2017 | 20:09

Share

Feedback

Comments deactivated

“School up”: Monsun is slowing down construction work

Construction site with puddles

The weather currently makes life tough not only for the mountaineers in the Karakoram. Also in Nepal it thwarts many time schedules. The work on the new school in Thulosirubari has now been slower because of the monsoon, writes me Shyam Pandit, Nepalese liaison man of the “Nepalhilfe Beilngries”. The German aid organization coordinates the construction of the new school building, which became possible through your donations for “School up!”. Along with the well-known climbers Gerlinde Kaltenbrunner and Ralf Dujmovits, I had launched the donation campaign two years ago to rebuild the village school of Thulosirubari, about 70 kilometers east of the capital Kathmandu, as quickly as possible. The school had been so badly damaged by the devastating earthquake in Nepal on 25 April 2015 that it had had to be demolished. Since fall 2016 the construction work is in progress. Actually, the first construction phase should have been completed before the rainy season.

Date

6. July 2017 | 15:35

Share

Feedback

Comments deactivated

The dream of becoming a model school

Plastering in the new rooms

Yesterday was the second anniversary of the devastating earthquake in Nepal. About 9,000 people died, more than 22,000 were injured, hundreds of thousands of homes collapsed or were severely damaged and thus became uninhabitable. Many people in the most affected mountain regions are still living in shelters. In the village of Thulosirubari in Sindhupalchowk District, about 70 kilometers east of the capital Kathmandu, has been a hive of construction activity over recent months. The donations for our aid project “School up!” have made it possible to start building a new school for more than 500 students, the construction is operated by the Nepalhilfe Beilngries. The old school had been so badly damaged by the earthquake that it later had had to be demolished. In recent weeks there have been temporary supply bottlenecks for constructions material, as well as a lack of water to mix concrete. Since the school ground is located on a hill, the water has to be pumped up or – if the pumps fail – even be carried up.

Date

26. April 2017 | 14:35

Share

Feedback

Comments deactivated

Nepalhilfe Beilngries: A successful family

“Family meeting” in Beilngries

An aid organization like a family – the Nepalhilfe Beilngries celebrated its 25th birthday yesterday evening with a festive event in the small Bavarian town. “I am proud that I have been part of the Nepalhilfe family since it was founded,” said Sunil Shrestha in his speech, bravely delivered in German. The 57-year-old has been coordinating the aid projects of the organization in the Himalayan state for a quarter of a century. Sunil and Shyam Pandit, also an important liaison man, had traveled, along with their wifes, from Kathmandu to Beilngries to celebrate with their German and Austrian friends. “The family should be proud of what we have achieved,” Shrestha said.

Date

19. March 2017 | 14:54

Share

Feedback

Comments deactivated

“School up!”: Second floor plate almost finished

Plate of the second floor

The relatively dry winter in the Nepalese district Sindhupalchowk has played into the hands of our aid project “School up!”. The construction work for the new school in the village of Thulosirubari, about 70 kilometers east of Kathmandu, could be continued almost without interruption. Meanwhile, the plate of the second floor is practically finished. The goal of completing the construction work (except for the painting) before the monsoon starts in summer seems realistic. The constructors of the new large Berlin airport who have not come to an end for years could take an example of such effectiveness (in Nepal!). Here are some more pictures:

Date

10. March 2017 | 14:20

Share

Feedback

Comments deactivated

Construction site with heart

The ceiling of the first floor is concreted

The ceiling of the first floor is concreted

Four are standing around and discussing, one is working. This image is known from public construction sites in Germany. The situation is quite different in Thulosirubari, a small village about 70 kilometers east of Kathmandu. There the new school is being built with great enthusiasm – made possible by your donations for our aid projekt “School up!”. “All villagers are happy to be able to help with the work,” says Shyam Pandit, liaison man of the German aid organization “Nepalhilfe Beilngries” in the Himalayan state. Devi Dulal, head of the local school committee, is also delighted: “This will be a unique building for us. The work on this is very satisfactory for us.” The old school had been so badly damaged by the devastating earthquake at the end of April 2015 that it had had to be demolished. At the end of June 2015, I had launched – along with the extreme climbers Gerlinde Kaltenbrunner and Ralf Dujmovits“School up!” to rebuild the school as quickly as possible. In the meantime, the ceiling of the first floor has been concreted. Here are some impressions of the construction site from the past weeks:

Date

31. January 2017 | 15:38